Dam, Sam!

Damage to the spillway keeps worsening at America’s tallest dam. Dam operators upped the flow to keep the reservoir from overflowing disastrously but they knew it would erode out a big part of the spillway. That’s about 150 yards of concrete “that will have to be painstakingly rebuilt during the dry months. Repair costs will likely top $100 million. Continue reading